|
Requirements: - Organisational support.
- Costed bill of materials.
- Part number list.
- Set of component drawings.
- Specifications.
Objectives: - Understand the business targets, product design and cost, and optimize the future-state operating system to meet the targets.
- Change the way in which the manufacturing cell is managed to reinforce the new system needed to achieve the optimum future state.
- Build a strong committment at all levels by changing mindsets, capabilities and behaviors to achieve the optimum future state and build necessary capability with significant cost reductions.
Timing: - The CP Component System team works on site to identify the ‘Quick Wins’.
- 4 week intensive period.
- Total transformations require rapid and focused change.
- Consultants should not become a "way of life" for our clients.
- We leave after enabling the transformation and building staff capabilities to drive further improvement on their own.
- The CP Component Systems umbilical support means that it’s people are still on hand to support and advise in the months following the project.
What you can expect? - Dependable, superior performance.
- Reduced number of defects to improve quality, cost reductions and on-time-in-full (OTIF) delivery.
- High asset utilization and capital productivity to satisfy capital market demand for high returns.
- Increase in labour productivity and reduction in operating space.
- High flexibility to cope with market volatility and satisfy demand for short lead times.
- Improved response times to meet increased scheduled demands and growth potential.
Business Performance Improvement
|